Search
327 S. Main Street, Pittsburgh
Green Building Tour at Pittsburgh Musical Theater
Join Green Building Alliance for a behind-the-scenes tour of the ongoing redevelopment of the Pittsburgh Musical Theater (PMT).
PMT is currently undergoing a $20 million, three-phase transformation. Phase 1: “Elevating the PMT Experience for ALL.,” is designed to modernize the building’s systems and infrastructure, provide accessibility to all six levels of the three-story building for the first time in its history, and secure the long-term future of PMT in the West End of Pittsburgh by energizing this vital business district corner of South Main St. and Sanctus.
During this tour of the 110-year-old former Saint James School, we’ll explore the challenges and lessons learned while balancing energy efficiency, location within a floodway, and being a contributing historic building of the West End Vally Historic District. Attendees will hear from the project team, including Rothschild Doyno Collaborative, Iams Consulting LLC, and Jendoco Construction, and learn about the embodied carbon, new DOAS system, benefits of separating the storm and sanitary systems, and electrification of the building’s MEP system, as well as innovative solutions to managing resilience in the face of changing flood map policies, and other climate impacts.
Following the tour, attendees will join the project team for light refreshments in the future lobby space.
Hard hats and closed-toed shoes will be required for this tour. If possible, please bring your own PPE; GBA will have a limited number of hard hats available to borrow on site.
Participants Will
1.) Explore the under-construction Pittsburgh Musical Theater
2.) Learn from the project team about the challenges and successes of the project
3.) Learn more about PMT’s commitment to sustainability, resilience, and Pittsburgh 2030 District Goals
4.) Gain insight into PMT’s role in building resilience in the existing West End community
This event is eligible for 1.5 AIA or self-reported GBCI CEUs.